18 July 2017

Stacking a rig

Storing a drilling rig upon completion of a job when the rig is to be withdrawn from operation for a period of time.
18 July 2017

Stake a well

To locate precisely on the surface of the ground the point at which a well is to be drilled. After exploration techniques have revealed the possibility […]
18 July 2017

String up

To thread the drilling line through the sheaves of the crown block and traveling block. One end of the line is secured to the hoisting drum […]