Pressure relief valve
18 July 2017
Prime mover
18 July 2017

Primary cementing

The cementing operation that takes place immediately after the casing has been run into the hole. It provides a protective sheath around the casing, segregates the producing formation, and prevents the undesirable migration of fluids. See secondary cementing and squeeze cementing.