Skidding the rig
18 July 2017
Slurry
18 July 2017

Slug the pipe

Before hoisting the drill stem from the hole, it is desirable to pump in to the top of the drill stem a quantity of very heavy mud which will cause the level of the fluid in the drill stem to fall as the drill stem is hoisted. Thus, when a stand of the drill stem has been unscrewed, the fluid will have been evacuated from it. This prevents the crew members and tools from becoming covered with drilling fluid.