Brake
18 July 2017
Breakout tongs
18 July 2017

Breaking down

Usually means unscrewing the drill stem into single joints and placing them on the pipe rack. This operation takes place at the completion of the well when the drill pipe will no longer be used. It also takes place when changing from one size drill pipe to another during drilling operations.